KG3 · Beabadoobee 2026 Headline Tour
Every pixel neon segment with its length, weight, addressable pixel count, and full-white power draw — grouped by run, with the load on each controller and flown power injector.
| Run | Segment | Length | Meters | Weight | Pixels | Watts | Amps @24V | Fed by |
|---|---|---|---|---|---|---|---|---|
| CTRL A · out 1 | DS1-1 | 30'0" | 9.14 | 4.6 kg | 183 | 211 | 8.8 | CTRL A·1 + NJCT @ DSP truss |
| DS1-2 | 30'6" | 9.30 | 4.6 kg | 186 | 214 | 8.9 | NJCT @ DSP + NJCT @ DS end | |
| DS1 total | 2 segs | 60'6" | 18.44 | 9.2 kg / 20 lb | 369 | 425 | 17.7 | |
| CTRL A · out 2 | DS2-1 | 30'0" | 9.14 | 4.6 kg | 183 | 211 | 8.8 | CTRL A·2 + NJCT @ DSP truss |
| DS2-2 | 30'6" | 9.30 | 4.6 kg | 186 | 214 | 8.9 | NJCT @ DSP + NJCT @ DS end | |
| DS2 total | 2 segs | 60'6" | 18.44 | 9.2 kg / 20 lb | 369 | 425 | 17.7 | |
| CTRL A · out 3 | DS3-1 | 30'0" | 9.14 | 4.6 kg | 183 | 211 | 8.8 | CTRL A·3 + NJCT @ DSP truss |
| DS3-2 | 30'6" | 9.30 | 4.6 kg | 186 | 214 | 8.9 | NJCT @ DSP + NJCT @ DS end | |
| DS3 total | 2 segs | 60'6" | 18.44 | 9.2 kg / 20 lb | 369 | 425 | 17.7 | |
| Cables DS | 6 segs | 181'6" | 55.32 | 27.7 kg / 61 lb | 1,107 | 1,275 | 53.1 |
| Run | Segment | Length | Meters | Weight | Pixels | Watts | Amps @24V | Fed by |
|---|---|---|---|---|---|---|---|---|
| CTRL B · out 1 | US4-1 | 28'4" | 8.64 | 4.3 kg | 173 | 199 | 8.3 | CTRL B·1 + NJCT @ USP truss |
| US4-2 | 21'10" | 6.65 | 3.3 kg | 134 | 153 | 6.4 | NJCT @ USP + NJCT @ US end | |
| US4 total | 2 segs | 50'2" | 15.29 | 7.6 kg / 17 lb | 307 | 352 | 14.7 | |
| CTRL B · out 2 | US5-1 | 28'4" | 8.64 | 4.3 kg | 173 | 199 | 8.3 | CTRL B·2 + NJCT @ USP truss |
| US5-2 | 21'10" | 6.65 | 3.3 kg | 134 | 153 | 6.4 | NJCT @ USP + NJCT @ US end | |
| US5 total | 2 segs | 50'2" | 15.29 | 7.6 kg / 17 lb | 307 | 352 | 14.7 | |
| CTRL B · out 3 | US6-1 | 28'4" | 8.64 | 4.3 kg | 173 | 199 | 8.3 | CTRL B·3 + NJCT @ USP truss |
| US6-2 | 21'10" | 6.65 | 3.3 kg | 134 | 153 | 6.4 | NJCT @ USP + NJCT @ US end | |
| US6 total | 2 segs | 50'2" | 15.29 | 7.6 kg / 17 lb | 307 | 352 | 14.7 | |
| Cables US | 6 segs | 150'6" | 45.87 | 22.9 kg / 51 lb | 921 | 1,057 | 44.0 |
Short spans, fed single-end from the pylon controller. No flown injectors on these runs.
| Run | Segment | Length | Meters | Weight | Pixels | Watts | Amps @24V | Fed by |
|---|---|---|---|---|---|---|---|---|
| CTRL C | USR1-1 | 16'0" | 4.88 | 2.4 kg | 98 | 112 | 4.7 | CTRL C single-end |
| USR1-2 | 16'0" | 4.88 | 2.4 kg | 98 | 112 | 4.7 | pass-through | |
| USR1-3 | 16'0" | 4.88 | 2.4 kg | 98 | 112 | 4.7 | pass-through | |
| USR1 total | 3 segs | 48'0" | 14.63 | 7.3 kg / 16 lb | 294 | 337 | 14.0 | |
| CTRL D | USR2-1 | 16'4" | 4.98 | 2.5 kg | 100 | 115 | 4.8 | CTRL D single-end |
| USR2-2 | 16'4" | 4.98 | 2.5 kg | 100 | 115 | 4.8 | pass-through | |
| USR2-3 | 16'4" | 4.98 | 2.5 kg | 100 | 115 | 4.8 | pass-through | |
| USR2 total | 3 segs | 49'0" | 14.94 | 7.5 kg / 16 lb | 300 | 344 | 14.3 | |
| Cables USR | 6 segs | 97'0" | 29.57 | 14.8 kg / 33 lb | 594 | 681 | 28.4 |
| Run | Segment | Length | Meters | Weight | Pixels | Watts | Amps @24V | Fed by |
|---|---|---|---|---|---|---|---|---|
| CTRL A · out 4 | Audience 1-1 | 26'2" | 7.98 | 4.0 kg | 160 | 184 | 7.7 | CTRL A·4 + NJCT @ AP1 truss |
| Audience 1-2 | 33'4" | 10.16 | 5.1 kg | 204 | 234 | 9.8 | NJCT @ AP1 + NJCT @ AP2 | |
| Audience 1-3 | 33'5" | 10.19 | 5.1 kg | 204 | 235 | 9.8 | NJCT @ AP2 + NJCT @ AP3 | |
| AUD1 total | 3 segs | 92'11" | 28.32 | 14.2 kg / 31 lb | 568 | 652 | 27.2 | |
| CTRL B · out 4 | Audience 2-1 | 27'2" | 8.28 | 4.1 kg | 166 | 191 | 7.9 | CTRL B·4 + NJCT @ AP1 truss |
| Audience 2-2 | 33'7" | 10.24 | 5.1 kg | 205 | 236 | 9.8 | NJCT @ AP1 + NJCT @ AP2 | |
| Audience 2-3 | 33'5" | 10.19 | 5.1 kg | 204 | 235 | 9.8 | NJCT @ AP2 + NJCT @ AP3 | |
| AUD2 total | 3 segs | 94'2" | 28.70 | 14.4 kg / 32 lb | 575 | 661 | 27.6 | |
| Audience | 6 segs | 187'1" | 57.02 | 28.5 kg / 63 lb | 1,143 | 1,314 | 54.7 |
Seven PWR-NJCT fly in the truss, one per pickup column, feeding every rope in the group via two 24V DC wires on NL4 down a drop: at the four DS/US columns the drop rides a cable retractor beside the Wahlberg Winch 50 (rigging only, no power or data pass-through); at AP 1/2/3 the pickup is a chain motor that stays static, so the drop is a fixed cable on the black pickup cable. Five PXL-CTRL sit at the run start points. Each ~9–10 m segment is fed from both ends.
| Box | Position | Feeds | Load | Amps @24V |
|---|---|---|---|---|
| CTRL A | Pylon rack, DS starts + AUD1 (4 outputs) | near half of DS seg 1 (105 W each) + near half of Audience 1-1 | 407 W | 17.0 |
| CTRL B | Pylon rack, US starts + AUD2 (4 outputs) | near half of US seg 1 (100 W each) + near half of Audience 2-1 | 395 W | 16.5 |
| CTRL C | Pylon rack, USR1 (3 outputs) | entire USR1 group, single-end | 337 W | 14.0 |
| CTRL D | Pylon rack, USR2 (3 outputs) | entire USR2 group, single-end | 344 W | 14.3 |
| PWR-NJCT 1 | DS pickup column (DSP), in truss · retractor | mid feed, all 3 DS cables | 637 W | 26.6 |
| PWR-NJCT 2 | DS end column (backdrop winches) · retractor | far half of all 3 DS seg 2 | 321 W | 13.4 |
| PWR-NJCT 3 | US pickup column (USP), in truss · retractor | mid feed, all 3 US cables | 528 W | 22.0 |
| PWR-NJCT 4 | US end column (scenic winches) · retractor | far half of all 3 US seg 2 | 230 W | 9.6 |
| PWR-NJCT 5 | AP1 chain motor, static (26'0" fixed drop) | AUD1 + AUD2 at AP1 | 422 W | 17.6 |
| PWR-NJCT 6 | AP2 chain motor, static (30'0" fixed drop) | AUD1 + AUD2 at AP2 | 470 W | 19.6 |
| PWR-NJCT 7 | AP3 chain motor, static (28'10" fixed drop) | AUD1 + AUD2 at AP3 | 235 W | 9.8 |
| Rig total | 4 PXL-CTRL + 7 PWR-NJCT | 24 segments · 187.8 m · 93.9 kg rope · 3,765 px | 4,327 W | 180.3 |
Full white worst case at the measured 23.04 W/m (0.96 A/m at 24 V — Aug 14 2026 bench test, 1 m sample, Cen-Tech meter in series; apply headroom above the measured max for PSU/cable sizing). Mains draw is ~36 A at 120V total, taken by the PSU/controller racks on deck; 24V DC is what travels down each winch on NL4. Weights are rope only at the KG3-measured 0.5 kg/m — add rigging rings at 0.5 kg per group of 4 (0.25 kg per group of 2) and the negligible 1 m factory leads.