KG3 · Beabadoobee 2026 Headline Tour

Rigging Weightspreliminary

What each pickup point carries. Rope measured at 0.45 kg/m on the actual product, planned at 0.5 kg/m for margin. Loads exclude the 1826-supplied catenary cables.

93.9 kgrope · 207 lb
38rigging points
116.0 kgtotal on points · 256 lb
16.4 kgheaviest point (DSP)

Point loads

Load per point = rope share (half of each adjacent span) + paired rings + a 1.8 kg feed-cable allowance at the 7 injection columns (DSP, DS end, USP, US end, AP1-3). The Winch 50 is rigging only, no power or data pass-through: at the four DS/US injector columns the 24V drop rides a cable retractor clamped in the truss, so nothing electrical loads the winch line (allowance kept as margin). AP1-3 do not winch: they are chain-motor pickups that fly to trim and stay static, and the fixed drop is lashed to the black pickup cable.

PointPointsRopes / pointLoad / pointlb
Cables DS
Pylon heads (one per cable)312.5 kg5.6
DSP winch column (LX truss) · retractor in truss1316.4 kg36.1
DS end column (backdrop winches) · retractor in truss139.5 kg21.0
Cables US
Pylon heads (one per cable)312.4 kg5.3
USP winch column (scenic truss) · retractor in truss1314.0 kg30.9
US end column (scenic winches) · retractor in truss137.5 kg16.6
Cables USR1 / USR2
Pylon points (one per cable)611.5 kg3.3
USR1 / USR2 backdrop winch columns234.4 / 4.5 kg~9.8
Audience (both ropes share AP points)
AUD1 / AUD2 anchors (DSE)212.3 kg5.1
AP1 chain motor (26'0" fixed drop)1211.5 kg25.4
AP2 chain motor (30'0" fixed drop)1212.5 kg27.6
AP3 chain motor (28'10" fixed drop)127.4 kg16.3
All points3814 runs116.0 kg256

What's flying